100-2330 15th Avenue
Regina, SK S4P 1A2
Canada

Ph. 306.777.0123
Fax. 306.525.6780

Projects

Recent Projects

Conexus South Albert Branch, Regina
The newly renovated 910 sq. M (9,800 sq. ft.)Conexus South Albert Branch, has a “State of the Art” HVAC system, incorporating economizer type free-cooling systems.

Owner: Conexus Credit Union
Client: PSW Architecture & Interior Design Ltd.
General Contractor: PCL-Maxam, A Joint Venture

Mechanical Systems: Modern roof top HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Constant volume units ensure maximum continuous occupant ventilation requirements are provided.


Capital Auto Mall, Regina
Opened in 2009 as the largest dealership in Western Canada, the Mall includes Capital Pontiac-Buick-GMC and Capital Ford-Lincoln dealerships along with Universal Collision Center detail & body shop facility.

Developer: Capital Group of Companies.
Client: DURA Construction Ltd., Walker Projects Inc., Capital Group of Companies
General Contractor: DURA Construction Ltd.
Mechanical Contractor: AllRite Plumbing & Heating Ltd.

Mechanical Systems: Year-round HVAC heating & cooling systems incorporating Air Cooled Individual-Zone fan coils & hot water heat provides year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple constant volume Roof Top Gas Fired heat/cool cooling/ventilation/make-up air units ensure maximum continuous occupant ventilation requirements. HVAC is provided through Roof Top VAV & Make-up Air units, along with hot water in-slab heating in all shop areas. All systems are monitored & controlled by a central DDC controls system with remote web based access.


Silverleaf Suites, Bateman & Main
Currently under construction in three phases in Saskatoon; Incorporates the three phases into one Condominium and Retirement living community.

Developer: RiverBend Developments Ltd.
Client: RiverBend Developments Ltd.
General Contractor: RiverBend Developments Ltd.
Mechanical Contractor: POW City Mechanical

Mechanical Systems: Year-round HVAC heating & cooling systems incorporating Air Cooled Individual-Zone fan coils & hot water heat provides year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple constant volume Roof Top Gas Fired heat/cool cooling/ventilation/make-up air units ensure maximum continuous occupant ventilation requirements.

Regina Center Crossing, Regina
Opened in 2009 the redeveloped former Superstore provides the city with one of the largest ‘Office Mall’ properties in the province. The Mall includes Engineering firms, Developments firms Advertising/Communication firms, Provincial government offices, Saskatchewan Tourism and Public Utility Offices along with the Roughrider’s indoor exercise facility and a future Deli style restaurant.

Developer: 1621 Albert Street Development Corporation.
Client: Walker Projects Inc.,1621 Albert Street Development Corporation, Century West Developments Projects Inc.
General Contractor: Century West Construction.
Mechanical Contractor: KD Mechanical Ltd.

Mechanical Systems: Roof Top HVAC heating & cooling systems incorporating free cooling Economizers, Electric & Hot Water perimeter heating, provide year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple constant volume Roof Top Gas Fired heat/cool cooling/ventilation units ensure maximum continuous occupant ventilation requirements. VAV by-pass systems provide terminal control where required. All systems are monitored & controlled by a central DDC controls system with remote web based access.

Douglas Park Elementary School, Regina
Currently under construction in Regina; Energy saving-Sustainable Design, incorporating Motion activated Air to Water heat pumps, domestic hot water preheat, in-floor heating, heat recovery ventilation, condensing high-efficient boilers and direct digital Controls system

Developer: Regina Public School Board.
Client: Number Ten Architects Ltd.
Project Manager: PCL Constructors
Mechanical Contractor: To be determined

Mechanical Systems: A year-round heating & cooling system incorporating Individual-Zone air to water and water to water Heat Pumps with hot water in-slab heat providing year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple heat-recovery constant volume Roof Top Gas Fired heat/cool cooling/ventilation/make-up air units ensure maximum continuous occupant ventilation requirements are accommodated.


Caleb Village, Chatham-Kent Ontario
Currently under construction in Chatham Ontario; The construction re-incorporates the existing Ursaline Sisters Monastery (The Pines) into a multi- unit Assisted Living Complex in a Christian Retirement Community.

Developer: Caleb Group of Companies
Client: Caleb Group of Companies
General Contractor: Caleb Construction
Mechanical Contractor: JMR Contracting

Mechanical Systems: A year-round heating & cooling system incorporating an Air Cooled Chiller, Dry Cooler with Individual Zone fan coils & electric heat provides year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple constant volume Roof Top Gas Fired heat/cool cooling/ventilation/make-up air units ensure maximum continuous occupant ventilation requirements are provided.

RCMP Chilled Water and Lawn Irrigation Systems, Regina
A 200 ton chilled water system that utilizes ground source well water as condenser water through plate type heat exchangers, allowing for a closed chilled water loop system and then utilizing the reject condenser water for lawn irrigation.

Developer: RCMP
Client: RCMP
Project Manager: Mechanical design group
Mechanical Contractor: Marathon Mechanical

Mechanical Systems: A seasonal cooling system that incorporated plate type heat exchangers to provide a closed chilled water loop to allow the water to be treated to maximize the life of downstream chilled water system components. Ground sourced well water was utilized as the condenser water. From two existing deep well pumping systems, the ground source water is first passed through the heat exchangers and then stored in a large storage tank to be used for lawn irrigation on the large RCMP depot site. Variable frequency pumps and the building’s automated control system were used to maintain pressure and temperature. With only the pumps requiring the use of electricity and no natural gas needed, this system provides measurable energy savings.


Past Projects

The new 1770 M² (19,100 Ft²) Conexus N.W. Branch, has a “State of the Art” HVAC system, incorporating  a winter free- cooling system.

Owner: Conexus Credit Union
Client: PSW Architecture & Interior Design Ltd.
General Contractor: PCL-Maxam, A Joint Venture
Mechanical Contractor: Marathon Mechanical Ltd.

Mechanical Systems: A digitally controlled 24/7 heating & cooling system incorporating hot water boilers, Air Cooled Chiller, Dry Cooler & Individual zone fan coils provides year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Constant volume make-up air units ensure maximum continuous occupant ventilation requirements are provided.

Casino Regina continues to expand and evolve into a full service Entertainment Facility.

Owner: Casino Regina
Client: Casino Regina
General Contractor: Various
Mechanical Contractor: Various

Mechanical Systems: Digitally controlled by a central Building Management System(BMS) multiple Roof Top Gas Fired heating & cooling units along with central systems incorporating hot water boilers provide year round HVAC capability for maximum occupant comfort. Various multi-level supply air distribution techniques are incorporated to distribute significant air volumes to a wide range of occupancy uses. Management/system operation of the “Sister” casino, Casino Moose Jaw is also provided through the BMS system.

Manoir de la  CATHÉDRALE Manor, currently under construction in Winnipeg; Reincorporates the existing Sisters of the Holy Names of Jesus and Marie Monastery into a 144 unit Assisted Living Complex in a Christian Retirement Community.

Developer: Caleb Group of Companies
Client: Caleb Group of Companies
General Contractor: Caleb Construction
Mechanical Contractor: Grasswood Mechanical

Mechanical Systems: A year-round heating & cooling system incorporating an Air Cooled Chiller, Dry Cooler with Individual Zone fan coils & electric heat provides year round HVAC capability for maximum occupant comfort, system/control & operational flexibility while maximizing energy savings potential. Multiple constant volume Roof Top Gas Fired heat/cool/ventilation/make-up air units ensure maximum continuous occupant ventilation requirements are provided.